單項(xiàng)選擇題Which action should be taken when an auxiliary boiler in is operation?()

A.Clean all electrical connections
B.Lift the relief valves by hand
C.Inspect and clean all solenoid valves
D.Inspect for oil and water leaks


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Ignition failure in an automatically controlled auxiliary boiler could be caused by()

A.carbon deposits on the flame scanner
B.high fuel oil temperature
C.low fuel oil viscosity
D.high steam pressure

2.單項(xiàng)選擇題Heavy soot accumulations in an auxiliary boiler could be caused by()

A.water in the fuel oil
B.excessive cycling
C.high fuel oil pressure
D.improper burner maintenance

3.單項(xiàng)選擇題The purpose of the programmed purge cycle on an automatically fired auxiliary boiler is to()

A.cool the furnace to prevent pre-ignition
B.remove explosive vapors from the furnace
C.evaporate accumulated unburned fuel oil
D.provide sufficient air in the furnace to allow ignition of the fuel

4.單項(xiàng)選擇題The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()

A.precipitate silica from solution
B.reduce corrosion in the heating coil
C.prevent clogging and erosion in the coil
D.maintain zero water hardness

5.單項(xiàng)選擇題Diesel engine waste heat boiler construction is usually of the fire-tube or()

A.cyclone furnace boiler type
B.dry back boiler type
C.water-tube type
D.critical circulation boiler type

最新試題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

To proceed to the assistance of a ship in distress is()

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

Under MARPOL Code the ship to which it applies has to carry ()

題型:?jiǎn)雾?xiàng)選擇題

If separating effect is not good, which measure should be taken ()

題型:?jiǎn)雾?xiàng)選擇題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:?jiǎn)雾?xiàng)選擇題

The main purpose of port State control is not to()

題型:?jiǎn)雾?xiàng)選擇題