A.including
B.besides
C.except
D.in addition to
您可能感興趣的試卷
你可能感興趣的試題
A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor
A.slipway
B.graving dock
C.ground warp
D.caisson dock
A.Moving high weights lower
B.Adding weight at the tipping center
C.Moving a weight forward
D.Moving lower weight high
最新試題
Which operation may cause the pressure in an inert tank to fall below the prescribed limits().
How should you signal the crane operator to hoist().
Running an electric winch at slow speed over a long period of time causes().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
Damage by()shall not be considered as handling damage.
How should you signal the crane operator to lower the boom and raise the load().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().
How should you signal the crane operator to move slowly().
They()loading at 1400 hours.
Official draft measurements should be()by authorized persons,agreed by both parties involved.