A.install oversized rings
B.hone the cylinder liner to allow ring installation
C.compress the rings tighter with a compressing tool
D.file the ends of the rings
您可能感興趣的試卷
你可能感興趣的試題
A.jam in the most worn part of the cylinder when the rings expand
B.break in the most worn part of the cylinder when the rings expand
C.wear eccentrically on the side opposite the end gap
D.overheat and jam at the top center on the combustion stroke
A.prevent governor surging at shutdown
B.make sure the fuel nozzles are flushed clean
C.prevent pressure buildup in the fuel lines
D.prevent damage from localized overheating
A.stop the combustion air supply
B.engage the jacking gear
C.secure the lube oil pump
D.shut off the fuel at the day tank
A.They conduct heat poorly
B.They are expensive
C.They cannot be replaced
D.They require special tools for removal
A.The diesel oil must never be allowed to mix with the heavy fuel
B.The temperature of the fuel from the pre–heater should be gradually reduced after switching over the three–way valve
C.The heating steam to the pre-heater should be secured as soon as the diesel fuel passes through the three-way valve
D.The heating steam must be secured before the diesel oil passes through the three-way valve
最新試題
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The shipboard oil pollution emergency plan will be invalid after ()
The ISPS Code consists of a mandatory section-Part A, which shows()