A.China Maritime Administration
B.the company
C.the cargo owner
D.ship owner
您可能感興趣的試卷
你可能感興趣的試題
A.water in the fuel oil supply
B.excessive fuel nozzle holder cooling
C.a distorted fuel spray pattern
D.leakage past the plunger into the oil drain
A.water in the fuel oil supply
B.excessive fuel nozzle holder cooling
C.a distorted fuel spray pattern
D.leakage past the plunger into the oil drain
A.fuel pumps
B.cylinders
C.fuel strainers
D.all of above
A.low TBN value
B.high alkaline reserve
C.low flash point
D.high pour point
A.up and draw in a fresh air charge
B.down to burn off fuel
C.down to compress the fuel air charge
D.up and force out the exhaust gases
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The ISPS Code consists of a mandatory section-Part A, which shows()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
If separating effect is not good, which measure should be taken ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Using a file without a handle may result in ()
The shipboard oil pollution emergency plan will be invalid after ()
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()