A.Cargo winch
B.Windlass
C.Steering gear
D.Main air compressor
您可能感興趣的試卷
你可能感興趣的試題
A.drain the accumulators and purge with oxygen
B.bleed off all stored energy from the accumulators completely
C.charge the accumulators to prevent system energy loss
D.pump the hydraulic fluid into the accumulators to prevent fluid loss
A.American Petroleum
B.Institute number viscosity index number
C.Seconds Saybolt Furol number
D.Seconds Saybolt Universal number
A.control equipment
B.power unit
C.transmission mechanisms
D.fittings and pipeline
A.stuffing boxes eliminate the leakage problems usually associated with other gear pumps
B.it is not necessary to closely maintain design clearances with this pump
C.they are essentially self-priming and produce a high suction lift
D.these pumps are designed with extreme tooth angled
A.seal water supply be cut off
B.make-up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oil is too much
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The treatment of the fuel oils involves storage, heating, filtering and()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The condensers located in various stages of a flash evaporator are cooled by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
To proceed to the assistance of a ship in distress is()
The ISPS Code consists of a mandatory section-Part A, which shows()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()