A.six months
B.two years
C.four years
D.five years
您可能感興趣的試卷
你可能感興趣的試題
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.bridge log
B.Master’s log
C.engine room log
D.oil record book
A.local port authority
B.Corps of Engineers
C.USCoast Guard
D.state pollution board
A.substandard ship
B.standard ship
C.over-standard ship
D.reference ship
A.The overall condition of the bearing surface should be examined
B.The shaft liner should be inspected for cracks and tested to insure a tight fit
C.The stern tube should be tested for cracks with dye penetrant
D.all of above
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Using a file without a handle may result in ()
The condensers located in various stages of a flash evaporator are cooled by()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The shipboard oil pollution emergency plan will be invalid after ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()