A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
您可能感興趣的試卷
你可能感興趣的試題
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
A.survivors in the water
B.food and water
C.land
D.bad weather
A.12 to 15 times per minute
B.18 to 20 times per minute
C.20 to 25 times per minute
D.as fast as possible
A.use the mouth-to-mouth method
B.clear airways
C.use rhythmic pressure method
D.know all approved methods
最新試題
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The shipboard oil pollution emergency plan will be invalid after ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
The condensers located in various stages of a flash evaporator are cooled by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The cetane rating of diesel fuel is an indication of the ()
The main purpose of port State control is not to()