A.Send the wiper into the well with only a scoop and pail
B.Remove the bilge manifold valve and attempt to back flush the line
C.Simultaneously operate all available bilge pumps
D.It is only necessary to transfer half the contents of a drum of degreaser into the bilge well
您可能感興趣的試卷
你可能感興趣的試題
A.surface fatigue
B.fretting corrosion
C.heavy overloading
D.gear misalignment
A.doing
B.make
C.turn
D.operating
A.why
B.which
C.in which
D.on which
A.until
B.not until
C.not before
D.not after
A.Heat is always transferred at a constant rate
B.Heat transfer rate increases as temperature difference increases
C.The rate of heat transfer is not affected by temperature difference
D.The high temperature region is known as a heat sink
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The main purpose of port State control is not to()
The condensers located in various stages of a flash evaporator are cooled by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Under MARPOL Code the ship to which it applies has to carry ()
The shipboard oil pollution emergency plan will be invalid after ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.