A.ship-owner’s
B.master’s
C.chief engineer’s
D.manager’s
您可能感興趣的試卷
你可能感興趣的試題
A.the SOLAS Convention
B.the MARPOL Convention
C.the STCW Convention
D.the LIAD LINE Convention
A.Absence, substantial deterioration or failure of proper operation of the cargo deck area fire protection on tanker
B.Absence, non-compliance or serious deterioration of lights, shapes or sound signal
C.Absence or failure of proper operation of the radio equipment for distress and safety communication
D.Absence in a watch of a person qualified to operate equipment essential to safe navigation, safety radio communications or the prevention of marine pollution
A.Failure of proper operation of propulsion and other essential machinery, as well as electrical installation
B.Failure of the proper operation of the main and auxiliary steering gear
C.Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration
D.Failure of the proper operation of emergency generator, lighting, batteries and switches
A.trim
B.lean
C.draft
D.tonnage
A.back of the vessel
B.the middle portion of a ship
C.a backward movement of a vessel
D.across the ship, at right angles to the fore-and-aft centerline
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
If separating effect is not good, which measure should be taken ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
() is not installed on the main switchboar.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()