A.In times of heavy weather, it is extremely dangerous if a seaman is not enough tall
B.In times of heavy weather, it is extremely dangerous if a crew is very short
C.In case of bad weather, it is particularly dangerous if there is a shortage in personnel
D.In case of bad weather, it is particularly dangerous if there are enough personnel
您可能感興趣的試卷
你可能感興趣的試題
A.should not be carried out during the watches
B.can only be carried out in port
C.is a kind of maintenances carried out prior to the occurrence
D.is a kind of maintenances carried out after the occurrence
A.to provide for safe practices in ship operation and a safe working environment
B.to establish safeguards against all identified risks
C.to continuously improve safety management skills of personnel, including preparing for emergencies
D.all the above
A.the ship owner
B.any person who has assumed responsibility for operating the ship
C.either A or B
D.neither A nor B
A.the manager of the shipping company
B.the master of the ship
C.the designated person on board ship
D.the designated person ashore
A.The control equipment
B.The power unit
C.The transmission system
D.The follow-up mechanism
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The condensers located in various stages of a flash evaporator are cooled by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Diesel engine air start system check valves are opened by ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
If separating effect is not good, which measure should be taken ()