單項(xiàng)選擇題Zinc rods are installed in the refrigeration system ().

A.liquid strainer
B.liquid receiver
C.saltwater condenser
D.evaporator


您可能感興趣的試卷

最新試題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項(xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:單項(xiàng)選擇題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:單項(xiàng)選擇題

Using a file without a handle may result in ()

題型:單項(xiàng)選擇題

To proceed to the assistance of a ship in distress is()

題型:單項(xiàng)選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:單項(xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:單項(xiàng)選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:單項(xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:單項(xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:單項(xiàng)選擇題