A.a sewage treatment plant
B.the extended aeration process
C.the liquor
D.the bubbling air
您可能感興趣的試卷
你可能感興趣的試題
A.in boiler drums
B.in refrigerating plants
C.in starting air pipes
D.in air coolers
A.boiler drums
B.hot wells
C.condensers
D.evaporators
A.high pressure alarm
B.fire alarm
C.extinguishers
D.fusible plugs
A.filled
B.evacuated
C.compressed
D.charged
A.greater
B.smaller
C.better
D.worse
最新試題
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The cetane rating of diesel fuel is an indication of the ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
To proceed to the assistance of a ship in distress is()
The shipboard oil pollution emergency plan will be invalid after ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Cold weather starting of a diesel engine may be made easier by()