單項選擇題A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().

A.holding its slops onboard until they can be pumped into the city sewer system
B.circulating them through the lube oil purifier to remove water and debris
C.holding its slops onboard until they can be discharged to a shore side reception facility
D.pumping them into a settling tank for separation before pumping the oily water residue overboard


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題At the earliest indication of fire aboard your vessel, you must FIRST().

A.locate the fire
B.determine which type of fire is burning
C.sound the alarm
D.fight the fire

2.單項選擇題The device used for preventing the passage of flames into enclosed spaces is called a ().

A.flame relief valve
B.flame stopper
C.safety valve
D.flame arrester

3.單項選擇題Your vessel has run aground and upon taking fuel oil tank soundings, you find that a fuel tank level has increasedYou therefore should suspect ().

A.condensation in the fuel tank
B.a crack in the hull portion of the fuel tank
C.a load of bad fuel
D.contamination from the saltwater flushing system

4.單項選擇題Following a grounding, you can best determine that a SLACK fuel oil tank has been holed by ().

A.sounding the tank
B.waiting for the vessel to list
C.examining tank boundaries
D.checking fuel oil strainers

5.單項選擇題Bilges may be pumped ().

A.on the outgoing tide
B.overboard after dark
C.overboard through an oily water separator
D.anytime in an emergency, i-emain engine lube oil failure

最新試題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:單項選擇題

The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()

題型:單項選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:單項選擇題

One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()

題型:單項選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:單項選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:單項選擇題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:單項選擇題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:單項選擇題