A.Class "A"
B.Class "B"
C.Class "C"
D.Class "D"
您可能感興趣的試卷
你可能感興趣的試題
A.Chain reaction
B.Thermal action
C.Chemical occlusion
D.Pyrotechnical reaction
A.starting the fire pumps
B.checking firemans outfits and other personnel rescue equipment
C.checking relevant communications equipment
D.All of the above
A.Class "A"
B.Class "B"
C.Class "C"
D.Class "D"
A.Conduction of heat to adjacent surfaces
B.Direct radiation
C.Convection
D.All of the above
A.gas freed
B.inerted
C.filled with water
D.all of the above as necessary
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The condensers located in various stages of a flash evaporator are cooled by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If separating effect is not good, which measure should be taken ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Under MARPOL Code the ship to which it applies has to carry ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The ISPS Code consists of a mandatory section-Part A, which shows()