A.all hands are at their fire stations
B.all fire-fighting equipment is at the scene
C.the fixed systems are activated
D.the fire is contained and no longer spreading
您可能感興趣的試卷
你可能感興趣的試題
A.one year
B.two years
C.four years
D.five years
A.not less than 3 years and be readily available for inspection
B.6 months and then submitted to the nearest Marine Safety Office for review
C.an annual inspection
D.the duration of the ships active employment
A.Any internal transfer of oil cargo during a voyage
B.The discharge overboard in port or at sea of any bilge water accumulated in machinery spaces
C.The loading or unloading of any or all oil cargo
D.All of the above
A.waterline
B.freeboard deck
C.Plimsoll mark
D.amidships section
A.Ballasting or cleaning of fuel oil tanks
B.Shifting suction of main fuel pump to reserve fuel oil tank
C.Changing out sprayer plates to adjust for steam demand
D.Daily inspection of engine room bilges
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Diesel engine air start system check valves are opened by ()
Using a file without a handle may result in ()
() is not installed on the main switchboar.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()