A.masters
B.chief engineers
C.crew
D.all personnel
您可能感興趣的試卷
你可能感興趣的試題
A.communicate
B.verify
C.audit
D.evaluate
A.communicate
B.verify
C.audit
D.evaluate
A.should bring
B.should be brought
C.should take
D.should be taken
A.with
B.without
C.against
D.above
A.general alarm and fire control plans
B.muster stations and duties of individual
C.patrol system
D.All of the above
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Under MARPOL Code the ship to which it applies has to carry ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The condensers located in various stages of a flash evaporator are cooled by()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
If separating effect is not good, which measure should be taken ()
The main purpose of port State control is not to()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which of the following items don’t belong to dock repair works?()