A.week
B.2 weeks
C.month
D.3 months
您可能感興趣的試卷
你可能感興趣的試題
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
A.The breaker should be closed when one synchronizing lamp is dark and the other is bright
B.The breaker should be closed when both synchronizing lamps are bright
C.The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
D.A portable phase sequence indicator must be used to verify the information from the lamps
A.100kw
B.400kw
C.500kw
D.600kw
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
To proceed to the assistance of a ship in distress is()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
() is not installed on the main switchboar.
The treatment of the fuel oils involves storage, heating, filtering and()
The ISPS Code consists of a mandatory section-Part A, which shows()