A.5 volts, the output changes 10 volts
B.10 volts, the output changes 5 volts
C.2 volts, the output changes 10 volts
D.10 volts, the output changes 2 volts
您可能感興趣的試卷
你可能感興趣的試題
A.penetration of moisture
B.accumulation of dirt
C.overheating
D.All of the above
A.90~0 kw
B.127~27 kw
C.155~70 kw
D.194~85 kw
A.normal operation
B.a dirty commutator
C.increased brush capacity
D.water vapor absorption
A.high mica condition
B.low ambient temperature
C.clogged ventilation ducts
D.an open in the shunt field
A.ampere
B.volt
C.watt
D.ohm
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The shipboard oil pollution emergency plan will be invalid after ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the following items don’t belong to dock repair works?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()