單項選擇題The total power consumed in a parallel circuit is ()

A.the sum of the powers used in each load (resistor)
B.divided by the number of loads
C.always less than the power used in the smallest load
D.the sum of the powers used in each individual load never more than the power used in the largest load


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Current measuring instruments must always be connected in ()

A.series with a circuit
B.parallel with a circuit
C.series-parallel with a circuit
D.delta with the shunt

2.單項選擇題The primary function of an electric motor is to ()

A.develop torque
B.generate high voltages
C.produce a magnetic field
D.generate high electrical resistance

3.單項選擇題The power factor at which a paralleled AC generator operates is usually adjusted by the ().

A.connected load
B.prime mover speed
C.field excitation
D.generators rated voltage

5.單項選擇題Equal power factors on paralleled AC generators are maintained by an automatic ().

A.voltage regulator
B.reverse power relay
C.reverse current relay
D.governor control switch

最新試題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:單項選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:單項選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:單項選擇題

The treatment of the fuel oils involves storage, heating, filtering and()

題型:單項選擇題

The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()

題型:單項選擇題

A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:單項選擇題

Flame failure in an automatically fired auxiliary boiler can from a/an ()

題型:單項選擇題

To proceed to the assistance of a ship in distress is()

題型:單項選擇題