A.droop
B.drop
C.dip
D.regulation
您可能感興趣的試卷
你可能感興趣的試題
A.sensor failure
B.failed alarm
C.low level
D.extremely high level
A.half the resistance of the other resistor
B.a resistance equal to the other
C.at least ten times the resistance of the other
D.a partial short circuit
A.To cut out generators when they are no longer required
B.To cut in additional generators automatically as required
C.To divide the KW load equally between generators operating in parallel
D.To divide reactive current between generators operating in parallel
A.capacitor in series with the load
B.inductor in series with the load
C.capacitor and inductor in series with the load
D.resistor in series with the load
A.the resistor next to the negative terminal
B.a short circuit
C.the resistor next to the positive terminal
D.an open circuit
最新試題
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Under MARPOL Code the ship to which it applies has to carry ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The cetane rating of diesel fuel is an indication of the ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()