A.prime mover speed
B.exciter output voltage
C.load on the alternator
D.number of poles
您可能感興趣的試卷
你可能感興趣的試題
A.shunt field
B.circuit breaker
C.metal framework
D.inter-pole
A.brushes
B.slip rings
C.commutators
D.all of the above
A.is usual
B.is not usual
C.is necessary
D.is not impossible
A.protective earth
B.isolators
C.ground switch
D.circuit-breakers
A.a closed loop control system
B.an open loop control system
C.a boiler control system
D.a steering gear control system
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The main purpose of port State control is not to()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()