A.open
B.open front type
C.live front type
D.None of the above
您可能感興趣的試卷
你可能感興趣的試題
A.alternator
B.glass thermometer
C.burdon tube
D.piezoelectric pressure transducer
A.the system is manned manually
B.the system is situated remotely from the operator
C.the system is controlled automatically
D.all the above
A.the capstan
B.the collector
C.the panels
D.the surface
A.distribution boards
B.section boards
C.emergency switch boards
D.main switch boards
A.distribution boards
B.section boards
C.emergency switch boards
D.main switch boards
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The main purpose of port State control is not to()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
If separating effect is not good, which measure should be taken ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The treatment of the fuel oils involves storage, heating, filtering and()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()