A.hydraulically operated pusher
B.spread beam sling
C.revolving roll clamping device
D.platform sling
您可能感興趣的試卷
你可能感興趣的試題
A.Duration of the voyage
B.Types of cargo units and vehicles to be carried
C.Weight of cargo units and vehicles
D.All of the above
A.Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holds
B.Turn on ventilation for cargo holds,raise/open the stern door,lower the stern ramp
C.Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern door
D.Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds
A.Exhaust gas pressure from the stack
B.High capacity fan
C.Inert gas compressor
D.Natural aspiration
A.Sale of effects of a deceased crew member
B.Medical treatment of an injury
C.Inspections of cargo gear
D.Dry docking of the vessel
A.Tainting
B.Wear and tear
C.Stevedore damage
D.Heating of grain
最新試題
When clearing customs for a foreign voyage,which of the following is processed at the custom’s house and returned to the vessel? ()
The shipping papers for the products being carried in your tanker are NOT required to contain the().
When measuring the oxygen content of the cargo tanks prior to loading cargoes requiring vapor recovery,check it().
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
The purpose of inert gas systems aboard tank vessels is to().
Which factor must be considered when determining the order of loading of dissimilar products through the same piping system aboard a tanker? ()
The piping that routes an oil cargo from the manifold to underdeck pipelines is known as a ().
To “shore up” the main deck for the stowage of deck cargo means to().
Which of the following is the stated proper sequence before commencing cargo operations aboard Ro-Ro vessels?()
Which is a negotiable document? ()