單項(xiàng)選擇題

In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
 

A. schedule
B. WBS
C. SOW
D. charter


你可能感興趣的試題

1.單項(xiàng)選擇題

( )can be considered as part of risk mitigation.
 

A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities

2.單項(xiàng)選擇題

( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
 

A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results

3.單項(xiàng)選擇題

The length of the IPv6 address is ( ).
 

A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits

5.單項(xiàng)選擇題以下關(guān)于變更的流程和規(guī)則的做法中,()是錯(cuò)誤的

A、以口頭方式提出某項(xiàng)變更,在評(píng)估前針對(duì)該變更提交了書面報(bào)告XXX
B、項(xiàng)目組成員變更以郵件發(fā)出,在評(píng)審前填寫了變更申請(qǐng)
C、為了規(guī)范,監(jiān)理不對(duì)變更進(jìn)行分級(jí),所有變更流程都不能簡化
D、按照影響范圍、緊急程度吧變更分為3個(gè)優(yōu)先級(jí)別

最新試題

總歷時(shí)(totalduration)是多少?()

題型:單項(xiàng)選擇題

識(shí)別和管理項(xiàng)目風(fēng)險(xiǎn)的責(zé)任應(yīng)由誰承擔(dān)?()

題型:單項(xiàng)選擇題

WBS之所以成為范圍變化控制的一個(gè)輸入量是因?yàn)椋海ǎ?/p>

題型:單項(xiàng)選擇題

以下哪個(gè)管理職能在賣方獲得合同的最后的支付前必須執(zhí)行?()

題型:單項(xiàng)選擇題

以下都是不良的小組合作情況,除了:()

題型:單項(xiàng)選擇題

你是一家非盈利組織的項(xiàng)目經(jīng)理。你的項(xiàng)目是由社會(huì)需求所產(chǎn)生的。你的贊助商希望馬上進(jìn)入規(guī)劃過程。然而,你知道在進(jìn)行規(guī)劃過程之前必須公布項(xiàng)目章程。對(duì)于項(xiàng)目章程,以下哪個(gè)說法不屬實(shí):()

題型:單項(xiàng)選擇題

談判的根本目標(biāo)是()

題型:單項(xiàng)選擇題

項(xiàng)目管理的過程管理和功能管理(知識(shí)領(lǐng)域)的關(guān)系是:()

題型:單項(xiàng)選擇題

你知道變更控制系統(tǒng)很重要,因?yàn)樗鼈兠枋隽巳绾翁峤蛔兏?qǐng)求并且記錄了如何管理變更、跟蹤變更的狀態(tài)和確定變更的管理影響。在控制過程組中下列哪個(gè)過程沒有運(yùn)用變更控制系統(tǒng)作為工具和技術(shù):()

題型:單項(xiàng)選擇題

假設(shè)是范圍啟動(dòng)過程的有效輸出。在執(zhí)行項(xiàng)目前,每個(gè)假設(shè)都必須被確定為:()

題型:單項(xiàng)選擇題